| 1. | Method 2 is the research based on connection number state sort 方法二:用联系数态势排序方法对工序实现可能性的研究。 |
| 2. | Predicting ultimate bearing capacity of pile foundation by connection number method 用联系数的方法进行桩基极限承载力的预估 |
| 3. | The model of pluralistic connection number for comprehensive evaluation and its application 综合评价的多元联系数模型及应用 |
| 4. | Application of five - element connection number to the quality assessment of the surface water environment 五元联系数在地表水环境质量评价中的应用 |
| 5. | A connection number - based principal factor analysis forecast method to forecast the encephalitis b epidemics 粤北地区慢性阻塞性肺疾病患病率调查 |
| 6. | A new method of evaluation of measurement uncertainty for steel bar tensile strength based on connection number 基于联系数的钢筋抗拉强度测量不确定度评定新方法 |
| 7. | The httperf tool can control the rate at which requests are issued , the total connection number , and the time - out limit Httperf工具可以控制发出请求的速度、总连接数和超时限制。 |
| 8. | Comparing this connection number with state sort table the grade of a working procedure ' s connection number is judged , then the possibility of this working procedure is got 并将这一联系数与态势排序表相对照,来判断工序作业时间的联系数所处的态势级,从而得出实现该工序的可能性。 |
| 9. | But it is difficult to determine the productive time of a working procedure , there is uncertainty of it . this uncertainty is random , fuzzy and intermediate uncertainty , which can be dealed by connection number method 然而在许多情况下,估计项目活动持续时间是非常困难的,项目活动时间具有不确定性,联系数是用来处理模糊,随机,中介不确定性的系统理论和方法。 |
| 10. | The way of improvement lies in adopting a system posture ordering based on connection number to carry out aggregative assessment so as to make full use of hierarchical information of different weighted targets to give an aggregative assessment conclusion which satisfies reality 改进的办法是采用基于联系数的系统态势排序进行综合评估,以充分利用不同权重指标的层次信息,得出符合实际的综合评估结论。 |